Snow Day Calculator

Notes · 2026-11-18 · 5 min read

Why ice closes school faster than snow

A quarter inch of freezing rain can shut a district that would stay open for three inches of snow.

Snow can be plowed. Ice has to be melted or chipped, and it takes the hills and the bridges first. Districts that own a fleet of plows still close for glaze because the buses cannot make the neighborhood grades. A forecast of three inches of snow and a forecast of a tenth of an inch of ice are not the same morning.

How the estimate treats it

Freezing rain and freezing drizzle in the evening-to-midmorning window add their own points, separate from the snowfall curve. When those points are the main signal, the page says Ice day rather than Snow day. A cold day is the other distinct label, for wind chill with little or no snow. Neither label is an official call.

The model still cannot see the treated roads, the power lines, or the fact that yesterday's ice is already sanded. That is why the number stays an estimate and stops short of 100.

Questions

Why does ice close school when snow does not?

Ice bonds to roads, sidewalks, and power lines. Plows and salt handle snow better than glaze, and a thin coat of ice is enough to stop buses on hills.

Does this site treat ice separately?

Yes. Freezing rain raises the closure estimate even when snowfall is near zero, and the result is labeled an ice day.

Snow Day Calculator publishes these notes as general information. Closure rules belong to each district or board.